This project for Watson Homes required complete electric planning and installation for a new building with 14 apartments.
CEB held several meetings with Watson Homes before checking the insurances, the teams and more. We were given a spec sheet of all materials that would be used on-site, but some had since become obsolete. As a result, we were able to find suitable alternatives to ensure a smooth process. Once made aware of the design issues we would be facing, we were able to work with the client to overcome these problems and provide our usual, wonderful service!
From internal flat wiring to lighting and power points installation, we took control of the complete electrical project. Their heating, security, and communications were planned and installed by us, ensuring each of the 14 apartments would be fully functional.